| Accelerators (Normal and Superconducting) | ||||||||
| Abstract ID | Title | Primary Authors | ||||||
| 43 | Operation and Upgradation of Low Energy Accelerator Facility at BARC | Mr. BASU, A | ||||||
| 72 | Kinematic analysis and experimental verification of a eccentric wheel based precision alignment mechanism for LINAC | Mr. MUNDRA, Girdhar | ||||||
| 81 | Design and Development of 75.6 MHz LINAC for VECC- RIB facility | Mr. CHAUHAN, Pratap Singh | ||||||
| 93 | Electrostatic Analysis of 750 keV DC Accelerator | Mr. KUMAR, Abhay | ||||||
| 108 | Design of an Infra-red Free-electron Laser at RRCAT | Dr. KUMAR, Vinit | ||||||
| 118 | Modifications and upgradations for 15 UD Pelletron accelerator at IUAC, New Delhi | Mr. JOSHI, Rajan | ||||||
| 119 | ANALYSIS OF EDDY CURRENT IN THE INDUS-2 DIPOLE VACUUM CHAMBER | Dr. SINHA, Gautam | ||||||
| 127 | THERMAL AND STRUCTURAL ANALYSIS OF PWT LINAC STRUCTURES | Mr. GUPTA, Saket Kumar | ||||||
| 138 | Experimental results of Linear Induction Accelerator-200. | Mr. PATEL, Ankur | ||||||
| 140 | Design & Operational Experience of 50kW, 120kHz Oscillator for 3MeV, 30kW DC Electron Beam Accelerator | Mr. SUNEET KUMAR SRIVASTAVA, Suneet | ||||||
| 155 | Exploring Storage Ring Lattices: Indus-1 & Indus-2 | Mr. HUSAIN, Riyasat | ||||||
| 161 | Operating Experience of 10 MeV Industrial RF Linac | Dr. MITTAL, K C | ||||||
| 164 | Performance of the 9 MeV RF linac for cargo scanning | Dr. MITTAL, K C | ||||||
| 180 | Studies of beam lifetime in Indus-2 electron storage ring | Mr. KUMAR, Pradeep | ||||||
| 202 | Terahertz radiation from an undulator-based FEL in India | Mr. LAL, Shankar | ||||||
| 204 | OPTIMIZATION OF Ti COATING THICKNESS FOR INDUS-2 INJECTION KICKER CERAMIC CHAMBER | Mr. ABDURRAHIM, Abdurrahim | ||||||
| 210 | Improvement in beam transmission through the Folded Tandem Ion Accelerator at BARC | Mr. GUPTA, Shrikrishna | ||||||
| 224 | THRESHOLD CURRENT AND GROWTH RATE CALCULATION FOR HIGHER ORDER MODES OF INDUS-2 RF CAVITY | Mr. PRASAD, M. | ||||||
| 245 | Modified centre region of K-130 Cyclotron for light ion beam acceleration | Mr. CHAKRABORTY, P. S. | ||||||
| 254 | EFFECT OF MIRROR TILTING ON STABILITY OF A FEL OSCILLATOR. | Mr. SAMANT, Sushil | ||||||
| 272 | MEASUREMENT AND ANALYSIS TO CURE BEAM INSTABILITIES DUE TO HIGHER ORDER MODES IN INDUS-2 | Mr. ARORA, Rajiv Kumar | ||||||
| 277 | Design and Development of Collimator for 9 MeV BARC-ECIL Linac | Mr. S R GHODKE, S R Ghodke | ||||||
| 304 | Cooling System for 3 MeV, 30 kW DC and 10 MeV, 10 kW RF Accelerators | Mr. SAROJ, P. C. | ||||||