List of Accepted Abstracts for Contributed Poster Presentation
Poster Session 1 (16 February 2011)
Poster Session 2 (17 February 2011)
Following is the list of abstracts accepted by National Organizing Committee for Contributed Poster Presentation at InPAC2011
Abstract ID | Title | Primary Authors | Track Name |
10 | Design of Composite magnetic circuits for Tuning of High power ferrite circulators at 352 & 700 MHz | Mr. SHINDE, R.s | Magnet Design and Technology |
11 | Further improvement in Residual Resistivity Ratio Measurement facility at RRCAT | Mr. YADAV, Anand | Superconductivity and Cryogenics (Related to Accelerators) |
12 | Manufacturing of 1.3 GHz Single cell Copper cavity for thin film deposition R & D | Mr. BAGRE, Manish | Accelerating Structures |
13 | Test Result with Foil Stripper Assemblies installed After 15 UD Pelletron Accelerator | Mr. OJHA, Sunil | New Acceleration Techniques and New Facilities |
14 | Superconducting low beta resonator for the high current injector at IUAC | POTUKUCHI, Prakash N. | Accelerating Structures |
16 | ARTIFICIAL NEURAL NETWORK BASED METHOD FOR BEAM POSITION CALCULATION AND CONSISTENCY CHECK FOR INDUS-2 BEAM POSITION MONITORS | Mr. TYAGI, Yetendra | Beam Dynamics |
17 | Beam optics design for a dual beam irradiation setup | Mr. SRIVASTAVA, Sachin | Beam Dynamics |
18 | Up-gradation of Booster Injection kicker magnets for reduced beam coupling impedance | Mr. SHINDE, Rs | Magnet Design and Technology |
19 | Studies of Prototype Transmission line extraction kicker magnet for Booster Synchrotron | Mr. SHINDE, R.s | Magnet Design and Technology |
25 | Preliminary Design of RF Coupler for 650MHz Superconducting Cavity | Mr. KUMAR, Ramesh | Accelerating Structures |
26 | Superconducting cavity tests at IUAC: Lessons learnt and subsequent improvements | Mr. RAI, A. | Superconductivity and Cryogenics (Related to Accelerators) |
27 | SOFTWARE DEVELOPMENT FOR INDUS-1 BUNCH FILLING PATTERN MESUREMENT | Mr. YADAV, Surendra | Beam Dynamics |
28 | Mechanical Design, Fabrication & Testing of Prototype RFQ | Mr. AHUJA, Rajeev | Accelerating Structures |
29 | Mechanical design of a prototype undulator for Indus- 2 | Mr. T, Veerabhadhraiah | Magnet Design and Technology |
30 | Study of high energy electron beam stability in laser-driven plasma-based acceleration | Mr. BOBBILI, Sanyasi Rao | New Acceleration Techniques and New Facilities |
31 | BEAM POSITION MEASUREMENT IN TRANSPORT LINE-1 OF INDUS ACCELERATOR | Mr. OJHA, Avanish | Beam Dynamics |
32 | DESIGN OF X-RAY DIAGNOSTIC BEAMLINE FOR INDUS-2 STORAGE RING | Mr. GARG, Akash Deep | Beam Dynamics |
33 | Design of Low-Beta Superconducting Resonator for Pelletron-LINAC Facility at TIFR | Dr. BASAK, T. | Accelerating Structures |
34 | MECHANICAL DESIGN OF EMITTANCE MONITOR FOR ION SOURCE OF H-LINAC FRONT END | Mr. KARNEWAR, Akhilesh Kumar | Beam Dynamics |
35 | Beam Line control System for BARC-TIFR Super Conducting LINAC Booster | Mr. SINGH, Sudheer | Instrumentation and Control Systems |
36 | Design of a 10 MeV, 352.2 MHz Drift Tube Linac | Ms. KULKARNI, Nita | Accelerating Structures |
37 | Mode Stabilization Study of 352.2 MHz Four-Vane Type RFQ | Mr. GAUR, Rahul | Accelerating Structures |
38 | Development of Penning Ion Source for 50 keV Ion Accelerator | Mr. KUMAR, Raj | Beam Sources |
41 | Beam dynamics simulations of high current injector of IUAC using TRACK code | Mr. KUMAR, Sarvesh | Beam Dynamics |
42 | Beam dynamics simulations of new low energy ion beam facility at IUAC Delhi | Mr. KUMAR, Sarvesh | Beam Dynamics |
43 | Operation and Upgradation of Low Energy Accelerator Facility at BARC | Mr. BASU, A | Accelerators (Normal and Superconducting) |
44 | A Programmable Bipolar Saw-tooth Current Power Supply for Scanning Magnet of 10 MeV LINAC at RRCAT | Mr. KASLIWAL, Apollo | Power Supplies, RF and Microwave Technology |
45 | Design & Construction of Laser based Electron Acceleration lab building. | Mr. PARCHANI, Govind | New Acceleration Techniques and New Facilities |
46 | PRECISE TEMPERATURE CONTROL & CALIBRATION OF ALIGNMENT INSTRUEMENTS FOR INDUS II | Mr. ARZARE, Deepak | New Acceleration Techniques and New Facilities |
47 | RF tests on the Prototype RFQ at IUAC | Mr. KUMAR, Sugam; Mr. SAFVAN, C. P. | Accelerating Structures |
48 | DESIGN AND SIMULATION RESULTS OF DIPOLE MAGNET FOR INSTITUTE OF PLASMA RESEARCH, GANDINAGAR | Mr. MALIK, Ritesh | Magnet Design and Technology |
50 | DESIGN AND SIMULATION RESULTS OF MASS SPECTROSCOPY DIPOLE MAGNET FOR BARC | Mr. MALIK, Ritesh | Magnet Design and Technology |
52 | New Power Supplies for Transport Line - 2 Quadrupole Magnets in Indus | Mr. SINGH, Alok | Power Supplies, RF and Microwave Technology |
53 | Design Study of Scaled down Dipole Magnet for Proton Synchrotron Sub-systems Project | Mr. DAS, S. | Magnet Design and Technology |
54 | Electron Beam Accelerator energy control system | Mr. SHARMA, Vijay | Instrumentation and Control Systems |
55 | End chamfer design of Quadrupole magnet for Booster synchrotron. | Mrs. THAKUR, Vanshree | Magnet Design and Technology |
56 | Scheme of microwave switch based arcing diagnostic system for 20 MeV pre-injector microtron of Indus complex | Mr. BHISIKAR, Abhay | Power Supplies, RF and Microwave Technology |
57 | DEVELOPMENT OF A HIGH PERFORMANCE THYRATRON DRIVER | Mr. BAROTHIYA, Rajesh | Power Supplies, RF and Microwave Technology |
58 | Study and characterization of dispenser cathode of 10 MeV linac | Mr. BHISIKAR, Abhay | Beam Sources |
59 | Development and performace characterization of 2kW, 505.8 MHz and 4kW 352 MHz Solid State RF Amplifiers | Mr. JAIN, Akhilesh | Power Supplies, RF and Microwave Technology |
60 | Design and Development of a low cost 2.45GHz ECR ion source for material sciences and other applications at IUAC New Delhi | Mr. MATHUR, Yaduvansh | Beam Sources |
61 | Fabrication status of 3MeV RFQ of LEHIPA Accelerator | Mr. JAIN, Piyush | Accelerating Structures |
63 | Parametric Design Study of Double Helix Quadrupole | Dr. RUWALI, Kailash | Magnet Design and Technology |
64 | Fabrication status of Drift Tube Linac (DTL) of LEHIPA Accelelator | Mr. JAIN, Piyush | Accelerating Structures |
65 | FLYBACK CONVERTER BASED CAPACITOR CHARGER WITH ASSURED DISCONTINUOUS CONDUCTION | Mr. SINGH, Yashpal | Power Supplies, RF and Microwave Technology |
67 | Development of an embedded system for a multi-channel high voltage control and monitoring in 1.7MV tandetron accelerator | Mr. KANNIAPPAN, Suresh | Instrumentation and Control Systems |
68 | Development of microcontroller based instrumentation for Low Dose implantation | Mr. KANNIAPPAN, Suresh | Instrumentation and Control Systems |
70 | Development of S-band RF Power Source for 10 MeV Industrial Linac | Mr. CHANDAN, Shiv | Power Supplies, RF and Microwave Technology |
71 | Distributed Remote Temperature Monitoring System for Indus-2 Vacuum Chambers | Mr. BHANGE, N. J.; Mr. GOTHWAL, P. | Instrumentation and Control Systems |
72 | Kinematic analysis and experimental verification of a eccentric wheel based precision alignment mechanism for LINAC | Mr. MUNDRA, Girdhar | Accelerators (Normal and Superconducting) |
73 | Design and development of L-Band Solid State pulsed 200W amplifier | Mr. MAHAWAR, Ashish; Mr. MOHANIA, Praveen | Power Supplies, RF and Microwave Technology |
74 | Design and initial development of 1kW pulsed S-Band solid state amplifier | Mr. MAHAWAR, Ashish; Mr. MOHANIA, Praveen | Power Supplies, RF and Microwave Technology |
79 | Design and Development of RF System for Vertical Test Stand for Characterization of Superconducting RF Cavities | Mr. MOHANIA, Praveen; Mr. RAJPUT, Vikas; Mr. BAXY, Deodatta | Power Supplies, RF and Microwave Technology |
81 | Design and Development of 75.6 MHz LINAC for VECC- RIB facility | Mr. CHAUHAN, Pratap Singh | Accelerators (Normal and Superconducting) |
82 | VMEDAC64 12-bit 64-Channel DAC for VME bus | Mr. SINGH, Kundan | Instrumentation and Control Systems |
83 | Operational experience and utilization of 750 keV DC Accelerator at RRCAT | Mr. PRAMOD, R | Applications |
84 | Design of a new controller for vacuum interlock system at BARC-TIFR Pelletron Accelerator Facility | Mr. YADAV, Madan Lal | Vacuum Technology |
85 | RF Coupler Design of 352.2 MHz RFQ | Mr. JANA, P. K. | Accelerating Structures |
86 | High Voltage Surge Protection System for Gun Power Supplies of 3MeV, 30kW DC Electron Beam Accelerator | Mr. R, Israel Bakhtsingh | Power Supplies, RF and Microwave Technology |
88 | Feasibility Study of Sub-Harmonic External Buncher for the 75 MHz Heavy Ion RFQ | Mr. MEHROTRA, Nitin | Accelerators (Normal and Superconducting) |
92 | Development of new Transport Line (TL-1) for Indus facility | Ms. K.C., Ratnakala | Vacuum Technology |
93 | Electrostatic Analysis of 750 keV DC Accelerator | Mr. KUMAR, Abhay | Accelerators (Normal and Superconducting) |
95 | Design of High Current Feedthrough for High Power Industrial Accelerator | Mr. SONI, Rakesh Kumar | Applications |
96 | Ozone Measurement in EXAFS Beam Line BL-8 of INDUS-2 | Mr. PETWAL, Vikash | Radiation Safety |
97 | Calculation of Air Speeds for Cooling Titanium Foils of High Power Electron Accelerator | Mr. KUMAR, Abhay | Applications |
98 | Lattice Design for Superconducting CW Linac for Project-X facility at Fermilab | Mr. SAINI, Arun | Beam Dynamics |
99 | Higher Order Mode Analysis using Panofsky Wenzel Theorem | Mr. JANA, Arup Ratan | Accelerating Structures |
100 | RF cavities for superconducting CW linac for Project-X facility at Fermilab | Mr. SAINI, Arun | Accelerating Structures |
102 | Compensation of failure of RF cavity in CW Superconducting Linac | Mr. SAINI, Arun | Beam Dynamics |
103 | Study of Higher Order Modes in the Project X linac | Mr. SAINI, Arun | Accelerating Structures |
104 | Design of a 2.45 GHz permanent magnet free ECR Ion Source for 1+ ion production in Radioactive Ion Beam facility at VECC | Ms. BHATTACHARJEE, Mahuwa | Beam Sources |
106 | Study of Window Foil Thickness for Accelerator Scanner | Mr. DUTTA, Subhajit | Vacuum Technology |
107 | Preliminary results of half cell forming for 650 MHz, beta 0.9 SRF cavity | Mr. SANDHA, Rajeshwar Singh | Accelerating Structures |
108 | Design of an Infra-red Free-electron Laser at RRCAT | Dr. KUMAR, Vinit | Accelerators (Normal and Superconducting) |
110 | Line-type modulator development for Multi-beam klystron in 10 MeV Industrial Electron Linac | Mr. TILLU, Abhijit | Power Supplies, RF and Microwave Technology |
111 | Design and Prototype development of Solid State modulator for Pulsed Electron Gun of the 10MeV Linac and related studies of Pulse transformer | Mr. TILLU, Abhijit | Power Supplies, RF and Microwave Technology |
112 | Design and development of 75MHz 1KW RF system with micro-controller based protection and control | Mrs. ., Sherry Rosily | Power Supplies, RF and Microwave Technology |
113 | Design and development of PCI Express digital I/O interface card | Mr. KULKARNI, Sunil | Instrumentation and Control Systems |
114 | Design and development of digital I/Q modulator | Mr. KULKARNI, Sunil | Instrumentation and Control Systems |
115 | A Python based interface for the Tandem-LINAC control system | Dr. KUMAR, Ajith | Instrumentation and Control Systems |
116 | A Compact Layout for IUAC High Current Injector | Dr. KUMAR, Ajith | Beam Dynamics |
117 | Control Scheme for Global Orbit Correction for Indus-2 | Mr. LULANI, Nitin | Instrumentation and Control Systems |
118 | Modifications and upgradations for 15 UD Pelletron accelerator at IUAC, New Delhi | Mr. JOSHI, Rajan | Accelerators (Normal and Superconducting) |
119 | ANALYSIS OF EDDY CURRENT IN THE INDUS-2 DIPOLE VACUUM CHAMBER | Dr. SINHA, Gautam | Accelerators (Normal and Superconducting) |
120 | EVALUATION STUDY OF CRYOGEN DISTIBUTION IN TIFR BARC SUPERCONDUCTING LINEAR ACCELERATOR | Mr. SINGH, Prashant | Superconductivity and Cryogenics (Related to Accelerators) |
121 | General Purpose Crate (GPC) for Control Application | Mr. SINGH, Kundan | Instrumentation and Control Systems |
122 | BEAM DIAGNOSTIC INSTRUMENTATION FOR TIFR-BARC LINAC | Mr. KARANDE, Jitendra | Instrumentation and Control Systems |
125 | Development of 350MHz,3 kW (CW and Pulsed) Radio Frequency (RF) amplifier | Mr. PATEL, Niranjan | Power Supplies, RF and Microwave Technology |
126 | FPGA Based 8-Channel 4K Analog to Digital Converter | Mr. VENNA, Veera Venkata Satyanarayana | Instrumentation and Control Systems |
127 | THERMAL AND STRUCTURAL ANALYSIS OF PWT LINAC STRUCTURES | Mr. GUPTA, Saket Kumar | Accelerators (Normal and Superconducting) |
128 | A remote phase locking system for the resonators of Linac at IUAC | Mr. DUTT, Rajendra Nath | Instrumentation and Control Systems |
130 | Operational Experience with SCADA System Based Controls for Indus-2 | Mrs. MERH, Bhavna N | Instrumentation and Control Systems |
131 | Fermilab High Intensity Proton Accelerator Project-X | Dr. MISHRA, Shekhar | New Acceleration Techniques and New Facilities |
132 | Web Based Electronic Log Book for Indus-2 | Mr. SRIVASTAVA, B.s.k. | Instrumentation and Control Systems |
134 | Optically Isolated remote operation and data acquisition system for ECR Ion source for LEHIPA | Mr. YADAV, Vivek; Mr. CHAVAN, Ramchandra | Instrumentation and Control Systems |
135 | DSP Controlled Filament Power Supply for 1 MW, 352.2 MHz Klystron | Mr. TRIPATHI, Akhilesh | Power Supplies, RF and Microwave Technology |
136 | 1 MW, 352.2 MHz, CW and Pulsed RF Test Stand | Mr. BADAPANDA, M. K. | Power Supplies, RF and Microwave Technology |
137 | Full Range ZVS DC-DC Converter | Ms. UPADHYAY, Rinki | Power Supplies, RF and Microwave Technology |
138 | Experimental results of Linear Induction Accelerator-200. | Mr. PATEL, Ankur | Accelerators (Normal and Superconducting) |
140 | Design & Operational Experience of 50kW, 120kHz Oscillator for 3MeV, 30kW DC Electron Beam Accelerator | Mr. SUNEET KUMAR SRIVASTAVA, Suneet | Accelerators (Normal and Superconducting) |
141 | Five Electrode ECR Proton Source for LEHIPA | Mr. ROYCHOWDHURY, Pradip | Beam Sources |
142 | INTERLOCK AND PROTECTION SCHEME OF 60 kW and 1 MW RF SYSTEMS FOR ACCELERATOR | Ms. SHARMA, Sonal | Power Supplies, RF and Microwave Technology |
145 | Embedded Control System for High Power RF Amplifiers | Mr. SHARMA, Deepak Kumar | Instrumentation and Control Systems |
146 | Design & Development of LEBT for LEHIPA Project | Ms. PANDE, Rajni | Beam Dynamics |
147 | RF CHARACTERIZATION OF DTL PROTOTYPE | Ms. ROY, Shweta | Accelerating Structures |
149 | Beamline for Emittance and Specie Measurement in ECR Proton Source | Mr. ROYCHOWDHURY, Pradip | Beam Sources |
150 | Power Supply for Electroplating for Chemical Treatment Applications at RRCAT | Mr. PAGARE, Anand | Power Supplies, RF and Microwave Technology |
151 | Frequency Measurement of 1.3 GHz Single Cell Cavity during Cool down upto 77 K | Mr. KOKIL, S. V. | Accelerating Structures |
152 | Power Source for Electron Gun of 3MeV DC Accelerator | Mr. DEWANGAN, Suryaprakash | Power Supplies, RF and Microwave Technology |
154 | Improvements in Indus Timing Control System and Experience with FPGA Based Delay Generator Boards | Mr. LULANI, Nitin | Instrumentation and Control Systems |
155 | Exploring Storage Ring Lattices: Indus-1 & Indus-2 | Mr. HUSAIN, Riyasat | Accelerators (Normal and Superconducting) |
156 | OPERATIONAL EXPERIENCE OF COMPRESSED AIR SYSTEM FOR LARGE ACCELERATOR COMPLEX | Mr. CHOUKSEY, Sanjay | Instrumentation and Control Systems |
158 | Performance of 3MV Voltage multiplier for 3MeV, 30kW DC Electron Beam Accelerator at EBC, Kharghar | Mr. SHARMA, Dharmendra Kumar | Power Supplies, RF and Microwave Technology |
159 | A Novel Demountable joint for UHV systems of Accelerators | Mr. R, Sridhar | Vacuum Technology |
161 | Operating Experience of 10 MeV Industrial RF Linac | Dr. MITTAL, K C | Accelerators (Normal and Superconducting) |
162 | Development of power supply and programmer for super-conducting solenoid magnet | Mr. KUMAR, Rajesh | Power Supplies, RF and Microwave Technology |
163 | Operational Experience and modifications in Electron Gun for the 10 MeV RF Linacs | Mr. BHATTACHARJEE, Dhruva | Beam Sources |
164 | Performance of the 9 MeV RF linac for cargo scanning | Dr. MITTAL, K C | Accelerators (Normal and Superconducting) |
165 | New True Bipolar Power Supplies for Booster Horizontal Steering Coils | Mr. SINGH, Shesh Nath | Power Supplies, RF and Microwave Technology |
166 | Design and Development of a Pierce Electron Gun. | Mr. BHATTACHARJEE, Dhruva | Beam Sources |
167 | Status Report on the Control & Acquisition System of Low Energy Accelerator Facility at BARC | Mrs. PADMAKUMAR, Sapna | Instrumentation and Control Systems |
168 | Transport of space charge dominated beam through the spiral inflector | Mr. GOSWAMI, A. | Beam Dynamics |
169 | Estimation of emittance growth in 10 MeV high current compact cyclotron | Mr. GOSWAMI, A. | Beam Dynamics |
171 | Low emittance electron beam optics commissioning in Indus-2 | Mr. FAKHRI, Ali Akbar | Beam Dynamics |
172 | Automatic fire water system for Accelerator Complex | Mr. RAWLANI, Bharat Kumar | Instrumentation and Control Systems |
174 | Fire safety at Indus Complex | Mr. SHARMA, Vishwambhar Datt | Instrumentation and Control Systems |
176 | Design and Development of a Pulse Power Supply for Testing of Pulse Quadrupole Magnet for 10MeV Drift Tube Linac | Mr. SANTOSH, Santosh Kumar Chauhan | Power Supplies, RF and Microwave Technology |
177 | Testing and Commissioning of High Power RF Amplifiers | Mr. UNNAM, Koteswara Rao | Power Supplies, RF and Microwave Technology |
180 | Studies of beam lifetime in Indus-2 electron storage ring | Mr. KUMAR, Pradeep | Accelerators (Normal and Superconducting) |
182 | Design, fabrication and initial testing of prototype plasma chamber for H- ion source | Mr. JAIN, Vikas | Beam Sources |
183 | Design and fabrication of prototype 3-electrode H- ion extraction system for Ion source | Mr. SRIVASTAVA, Vivek | Beam Sources |
184 | Electron Cyclotron Resonance Plasma Diagnostics to study microwave power coupling with Langmuir Probe | Mr. JAIN, Sunil | Beam Sources |
185 | Fibre Optic Control for Electron Gun Power Supplies and Data Acquisition of 3MeV DC Accelerator | Mr. CHAVAN, Ramchandra | Instrumentation and Control Systems |
186 | Linac Parameter Acquisition System (LiPAS) for 9MeV RF Linac | Mr. CHAVAN, Ramchandra | Instrumentation and Control Systems |
187 | Improvements in RF Input unit for Injector microtron for Indus SRS Complex | Mr. GOSWAMI, S.g. | Power Supplies, RF and Microwave Technology |
188 | HIGH POWER, LOSSLESS, RIGID LINE 2- WAY RF POWER COMBINERS | Mr. GUPTA, Alok Kumar | Power Supplies, RF and Microwave Technology |
189 | Modified bunch filling scheme for Indus-2 | Mr. PRAJAPATI, Sanjay Kumar | Beam Dynamics |
190 | Development of three channel linear bipolar high voltage(±2kV) amplifiers for electrostatic steerer/ scanner | Mr. KUMAR, Rajesh | Power Supplies, RF and Microwave Technology |
191 | Development of bipolar triangular wave current regulated power supply ( ±75A, ±50V) for high field Ion beam scanning magnet | Mr. SUMAN, Subhash Kumar; Mr. KUMAR, Rajesh | Power Supplies, RF and Microwave Technology |
192 | Development of 7-position beam-line selector switch (300Amp.) and controller | Mr. KUMAR, Rajesh; Mr. SUMAN, Subhash Kumar | Instrumentation and Control Systems |
193 | Development of tube based 2kW, 97 MHz RF amplifier | Mr. KUMAR, Rajesh; Mr. KUMAR, Raj | Power Supplies, RF and Microwave Technology |
194 | Static Electron gun Power Supplies for 3MeV DC Accelerator | Mr. NARAYANAN RAJAN, Rehim | Power Supplies, RF and Microwave Technology |
195 | Simulations using FORTRAN Program to understand bunching phenomenon in linacs | Mr. BHATTACHARJEE, Dhruva | Beam Dynamics |
196 | Radiation environment at Ti:Sapphire Laser Plasma Laboratory of RRCAT Indore | Mrs. VERMA, Dimple | Radiation Safety |
197 | Design and Development of Pill-box type Reduced Waveguide RF Window for 5 GHz , 250 kW klystron | Mr. LAMBA, Onkar Singh | Accelerating Structures |
198 | DESIGN AND IMPLEMENTATION OF THE WIRELESS HIGH VOLTAGE CONTROL SYSTEM | Mr. SRIVASTAVA, Saurabh | Instrumentation and Control Systems |
199 | Perfect dipole field in superconducting magnets with a coil shape different from cos(theta) shape | Dr. SARMA, P. R. | Magnet Design and Technology |
200 | SAFETY ANALYSIS OF TITANIUM FOIL WINDOW AFTER SCAN FAILURE IN 10 MeV RF SYSTEM | Mr. RAJESH BARNWAL, Rajesh | Instrumentation and Control Systems |
201 | MODIFICATIONS AND INPROVEMENTS IN THE REMOTE CONTROL SYSTEM OF THE HIGH CURRENT ION SOURCE | Mrs. CHATTERJEE, Mou | Instrumentation and Control Systems |
202 | Terahertz radiation from an undulator-based FEL in India | Mr. LAL, Shankar | Accelerators (Normal and Superconducting) |
203 | Beam dynamics studies of Radio Frequency Quadrupole accelerator for project X | Mr. SISTA, V.l. S Rao | Beam Dynamics |
204 | OPTIMIZATION OF Ti COATING THICKNESS FOR INDUS-2 INJECTION KICKER CERAMIC CHAMBER | Mr. ABDURRAHIM, Abdurrahim | Accelerators (Normal and Superconducting) |
207 | RF characterization and measurement of a full scale copper prototype of 5-cell elliptical shape Superconducting RF linac cavity | Ms. SETH, Sudeshna | Accelerating Structures |
208 | Design study on 650MHz, high-? multi-cell elliptical shape superconducting RF linac cavity | Ms. SETH, Sudeshna | Accelerating Structures |
210 | Improvement in beam transmission through the Folded Tandem Ion Accelerator at BARC | Mr. GUPTA, Shrikrishna | Accelerators (Normal and Superconducting) |
211 | Study of Ion trapping phenomena in Indus-2 storage ring | Mr. JENA, Saroj | Beam Dynamics |
212 | BEAM TRIALS AT 1 MeV OF A DC ELECTRON ACCELERATOR | Mr. ACHARYA, S. | Beam Dynamics |
213 | POWER SUPPLIES FOR THE RF-SYSTEM OF K=130 CYCLOTRON AT VECC, KOLKATA | Mr. BANDYOPADHYAY, Samit | Power Supplies, RF and Microwave Technology |
214 | DESIGN, DEVELOPMENT AND OPERATION OF A SCANNING POWER SUPPLY FOR AN RF ELECTRON LINEAR ACCELERATOR | Mr. ACHARYA, Satyanarayan | Power Supplies, RF and Microwave Technology |
216 | Scheme for beam energy spread measurement of 20 MeV Microtron | Mr. SAINI, R.s. | Beam Dynamics |
217 | Electron beam optics design of variable energy beam transport line for a tunable infra-red free-electron laser at RRCAT | Mr. SAINI, R.s. | Beam Dynamics |
218 | Industrial Pinch Diode for Flash X-Rays Generation using Compact Marx Generator | Dr. SHARMA, Archana; Ms. AGRAWAL, Ritu; Mr. SAROJ, P.c.; Dr. NAGESH, K.v.; Mr. CHAKRAVARTHY, D.p. | New Acceleration Techniques and New Facilities |
219 | Design and development of a double ridged waveguide for microwave ion source | Mr. MISRA, Anuraag | Beam Sources |
222 | AMS Facility at IUAC, New Delhi - Status report | Mr. KUMAR, Pankaj | Applications |
223 | DESIGN AND FABRICATION OF A 476 MHz SUB-HARMONIC BUNCHER CAVITY | Mr. CHOUKSEY, Sanjay | Accelerating Structures |
224 | THRESHOLD CURRENT AND GROWTH RATE CALCULATION FOR HIGHER ORDER MODES OF INDUS-2 RF CAVITY | Mr. PRASAD, M. | Accelerators (Normal and Superconducting) |
225 | Monte Carlo Simulation & Dosimetric Studies for a 10MeV RF Electron Linear Accelerator | Mr. CHAUDHARY, Nishant | Beam Dynamics |
226 | Design and implementation of a wireless control system for the 18 GHz High Temperature Superconducting ECR Ion Source, PKDELIS | Mr. DUTT, Rajendra Nath | Instrumentation and Control Systems |
227 | Study of Impurity Distribution of Electropolished and Buffer Chemical Polished Niobium Samples | Mr. BOSE, Aniruddha | Superconductivity and Cryogenics (Related to Accelerators) |
228 | Development of Ku-Band Waveguide Break for ECR-3 Ion Source | Mr. MISRA, Anuraag | Beam Sources |
229 | Quench analysis for the Energy Buncher Dipole Magnets of FAIR project | Mr. DUTTA GUPTA, Anjan | Magnet Design and Technology |
230 | Beam envelope oscillations and amplitude growth in a high current compact cyclotron | Dr. PANDIT, V. S. | Beam Dynamics |
231 | Development of 2.45 GHz high current microwave ion source at VECC | Dr. PANDIT, V. S. | Beam Sources |
232 | Analysis and Design of High Power Solid-state Module at 350 MHz for RF Accelerator | Mr. BALA, V Ramarao | Power Supplies, RF and Microwave Technology |
233 | EFFECT OF THE BEAM LOADING ON RF CAVITIES IN INDUS-2 AT RRCAT | Mr. BOHREY, Ashish | Power Supplies, RF and Microwave Technology |
234 | Development & Characterisation of Prototype RFQ at BARC | Mr. RAO, S.v.l.s. | Accelerating Structures |
235 | DESIGN AND DEVELOPMENT OF BIPOLAR (±300A) SWITCH-MODE POWER CONVERTER FOR SUPERCONDUCTING MAGNETS | Mr. KUMAR, Yashwant; Mr. THAKUR, Sajjan Kumar | Power Supplies, RF and Microwave Technology |
236 | Focussing Magnets For Drift Tube Linac | Mr. TEOTIA, Vikas; Mr. MALHOTRA, Sanjay | Magnet Design and Technology |
237 | THEORETICAL EVALUATION OF THE PUMPING PERFORMANCE OF THE CRYO-PANELS FOR THE K500 SUPERCONDUCTING CYCLOTRON | Mr. AKHTER, Javed | Vacuum Technology |
238 | Temperature distribution for Trimmer capacitor with modified Contact fingers of K-130 Cyclotron. | Mr. MANDAL, Bidhan Ch | Accelerating Structures |
239 | Layout Design and Installation of Low Energy Ion Beam Facility at IUAC | Mr. BARUA, Pradip | New Acceleration Techniques and New Facilities |
240 | Advanced closed-loop trimmer control system for fine tuning the RF cavity of K500 Superconducting Cyclotron | Mr. MANDAL, Aditya; Mr. GHOSH, Surajit | Power Supplies, RF and Microwave Technology |
241 | Engineering Design, Analysis and Prototype Fabrication of 3 MeV, 352.2 MHz RFQ Structure | Mr. JOSHI, Satish Chandra | Accelerating Structures |
242 | Development of Frequency Measurement Set up for 1.3 GHz SCRF Cavity Half Cells and Dumbbells | Mr. KANE, Ganapati Vilas | Accelerating Structures |
243 | Up-gradation of Radiofrequency System for the k130 Room Temperature Cyclotron | Mr. MANDAL, Aditya; Ms. SETH, Sudeshna | Power Supplies, RF and Microwave Technology |
244 | 3-D Thermo-Structural and Mechanical Resonance Studies for 352.2 MHz , 3 MeV RFQ | Mr. SHARMA, Navneet | Accelerating Structures |
245 | Modified centre region of K-130 Cyclotron for light ion beam acceleration | Mr. CHAKRABORTY, P. S. | Accelerators (Normal and Superconducting) |
246 | SPINDLE CUSP FIELD BY PERMANENT MAGNET FOR 18 GHz ECR ION SOURCE | Dr. RASHID, Md. Haroon | Beam Sources |
250 | DIPOLE MAGNET FOR CHARGE ANALYSIS OF EXTRACTED COCKTAIL ION BEAM FROM ECR3 IN VECC | Dr. RASHID, Md. Haroon | Magnet Design and Technology |
251 | Design and analysis of RF power Combiners/splitters at 350MHz | Mr. MISHRA, Jitendra | Power Supplies, RF and Microwave Technology |
252 | BEAM DYNAMICS WITH NEW BOOSTER DIPOLES | Mr. HUSAIN, Riyasat | Beam Dynamics |
253 | Acceleration of electrons using two identical co-propagating lasers in a homogenous plasma | Mr. SARKAR, Deepangkar | New Acceleration Techniques and New Facilities |
254 | EFFECT OF MIRROR TILTING ON STABILITY OF A FEL OSCILLATOR. | Mr. SAMANT, Sushil | Accelerators (Normal and Superconducting) |
255 | Acceleration of electrons in a cavitated region generated by a short, intense laser pulse interacting with a homogeneous plasma | Dr. UPADHYAY, Ajay Kumar | New Acceleration Techniques and New Facilities |
256 | 360 deg electronic analog RF phase shifters at 1.3GHz for use in phase control of electron Linac at VECC. | Mr. BASAK, Subhasish | Power Supplies, RF and Microwave Technology |
257 | Recent experience on operation and trouble shooting of 4.4K refrigerator during long run of LINAC | Mr. CHOUDHURY, Anup | Superconductivity and Cryogenics (Related to Accelerators) |
259 | Stress Analysis of Super-FRS Quadrupole Magnet system of FAIR | Mr. BHUNIA, Uttam | Magnet Design and Technology |
261 | Tunable Waveguide WR2300 to N-type Coaxial Adapter | Prof. KUMAR, Girish | Power Supplies, RF and Microwave Technology |
262 | Structural, Magnetic characterization and frequency dependent complex permeability studies of Prototype Nanophase Gd-substituted Yttrium Iron Garnets for Ferrite Circulators at 352 MHz & 700 MHz | Mr. KUMAR, Senthil; Mr. R.S., Shinde | Magnet Design and Technology |
263 | Design of monitoring and tuning system of resonant frequency for RFQ | Mr. DUTTA, Dipta Pratim | Instrumentation and Control Systems |
265 | Development of 37.8 MHz, 3.0 kW RF Amplifier for post buncher of RIB project | Mr. PANDEY, Hemendra Kumar | Power Supplies, RF and Microwave Technology |
266 | Electromagnetic and thermo-mechanical coupled analysis of elliptical superconducting cavity for e-linac project for estimating frequency detuning. | Mr. AHAMMED, Manir | Accelerating Structures |
267 | Beam Dynamics Study prior to extraction in Kolkata Superconducting Cyclotron | Mr. PAUL, Santanu | Beam Dynamics |
268 | Design and magnetic field measurement of solenoid magnets for the vertical injection beam line of Kolkata Superconducting Cyclotron | Mr. NASER ABDUL, Md Zamal | Magnet Design and Technology |
270 | Home made FPGA based instrumentation development for LINAC automation at IUAC | Mr. ANTONY, Joby | Instrumentation and Control Systems |
271 | A stable Cryogenic data acquisition & control system (CRYO-DACS) with sms, mobile & web interfaces and FPGA based sensor instrumentation | Mr. ANTONY, Joby | Instrumentation and Control Systems |
272 | MEASUREMENT AND ANALYSIS TO CURE BEAM INSTABILITIES DUE TO HIGHER ORDER MODES IN INDUS-2 | Mr. ARORA, Rajiv Kumar | Accelerators (Normal and Superconducting) |
273 | Study of cylindrical reentrant output cavity for 350 MHz klystron | Dr. TIWARI, Ashish | Power Supplies, RF and Microwave Technology |
274 | STUDIES ON BEAM TUNING PARAMETERS OF KOLKATA SUPERCONDUCTING CYCLOTRON | Mr. DEBNATH, Jayanta | Beam Dynamics |
275 | Minimization of Higher Order Harmonics for Large Aperture Super-ferric Quadrupole Magnet | Mr. DUTTA, Atanu | Magnet Design and Technology |
276 | THERMAL SIMULATION OF LINAC CAVITY OF 10 MeV RF SYSTEM | Mr. RAJESH BARNWAL, Rajesh | Accelerating Structures |
277 | Design and Development of Collimator for 9 MeV BARC-ECIL Linac | Mr. S R GHODKE, S R Ghodke | Accelerators (Normal and Superconducting) |
278 | TO AND FRO CONVEYOR SYSTEM FOR LESS IRRADIATION DOSE APPLICATIONS USING 10 MEV LINAC FACILITY | Mr. KUMAR, Mukesh | Instrumentation and Control Systems |
280 | UTILIZATION OF 10 MEV LINAC FACILITY FOR INDUSTRIAL APPLICATIONS AND RESEACRCH EXPERIMENTS | Dr. MITTAL, K C | Applications |
281 | HARD-WIRED INTERLOCK SYSTEM WITH FAULT LATCHABILITY AND ANNUNCIATION PANEL FOR ELECTRON ACCELERATORS | Mr. KUMAR, Mukesh | Instrumentation and Control Systems |
282 | Commissioning & optimization of Indus-2 RF System for 2 GeV/100mA | Mr. LAD, Mahendra Lad | Power Supplies, RF and Microwave Technology |
283 | Electron beam welding of niobium resonant cavities at IUAC | MISTRI, Kishore Kumar | Accelerating Structures |
284 | Integration of 31.6MHz, 1kW Solid State RF power Amplifier in the Booster RF system | Mr. BAGDUWAL, Pritam S. | Power Supplies, RF and Microwave Technology |
285 | SIMULATION OF ION BEAM OPTICS FOR FOCUSED ION BEAM SYSTEM | Ms. MENON, Ranjini | Beam Dynamics |
286 | LARGE AREA, DIRECT WRITE FOCUSED ION BEAM LITHOGRAPHY SYSTEM | Mr. P Y, Nabhiraj | Applications |
287 | Small Solenoid for Ultra-Low Temperature Cryostat | Mr. PRADHAN, Jedidiah | Magnet Design and Technology |
288 | Vacuum Processing and Testing of high power pulsed Klystron for 10 MeV Industrial Linear Accelerator | Dr. JOSHI, Lm | Power Supplies, RF and Microwave Technology |
291 | A new kind of extraction system for a high performance ECR ion source : a short RFQ channel | Mr. RODRIGUES, Gerard | Beam Sources |
293 | Thermo magnetic and electromagnetic properties of rare earth microwave garnets for high power circulator | Dr. ADITYA, L | Magnet Design and Technology |
294 | DESIGN, FABRICATION, RF TEST AT 2K OF 1050 MHZ, ?=0.49 NIOBIUM SINGLE CELL ELLIPTIC CAVITY FOR HIGH CURRENT PROTON ACCELERATOR | Mr. MONDAL, Jayanta | Accelerating Structures |
295 | BEAM LOADING AND TEMPERATURE DETUNING OF 10 MEV RF LINAC AND THE REVISED COUPLER GEOMETRY FOR OPTIMAL PERFORMANCE | Mr. MONDAL, Jayanta | Beam Dynamics |
296 | DESIGN AND MULTIPACTING STUDY OF A BETA=1, FREQUENCY 1050 MHZ RF SUPERCONDUCTING ELLIPTICAL CAVITY FOR PROTON BEAM LINAC | Ms. GHATAK, Shreya | Accelerating Structures |
297 | Development of Eddy current probe for measurement of Titanium coating thickness on ceramic vacuum chamber of Indus-2 Kicker magnets | Mr. PAREEK, P | Magnet Design and Technology |
298 | Restoration of Pulsed Septum magnets for 2.5 GeV Storage ring (Indus-2) | Mr. SHINDE, R.s | Magnet Design and Technology |
299 | Characterization of Detonation-sprayed Alumina Coating for Improved Performance of Septum Magnet Coils of Indus-2 | Mr. KAUL, Rakesh; Mr. SHINDE, R.s | Magnet Design and Technology |
300 | Trim Coil Temperature Control System for SCC | Mr. BHOLE, Rajendra | Instrumentation and Control Systems |
301 | Deflector Power supply control for Room Temperature Cyclotron | Mr. BHATTACHARJEE, Tanushyam | Instrumentation and Control Systems |
302 | Distributed Control System in RTC - an experience with EPICS | Mr. BHATTACHARJEE, Tanushyam; Dr. PAL, Sarbajit; Mr. BHOLE, Rajendra Balakrishna; Mr. CHADDHA, Niraj; Dr. SARKAR, Debranjan | Instrumentation and Control Systems |
303 | MULTIPLE PARAMETER CONTROL USING SOFT-CONSOLE | Mr. CHADDHA, Niraj | Instrumentation and Control Systems |
304 | Cooling System for 3 MeV, 30 kW DC and 10 MeV, 10 kW RF Accelerators | Mr. SAROJ, P. C. | Accelerators (Normal and Superconducting) |
306 | Modification of Cryogenic System of VECC at Kolkata and Experiences in Commissioning of a new Helium Refrigerator | Mr. DEY, R; Dr. PAL, Sandip | Superconductivity and Cryogenics (Related to Accelerators) |
307 | Fault protection system in a Regulated high voltage power supply (80kV, 130A) for Neutral beam injector (SST-1) | Mr. PATEL, Paresh | Power Supplies, RF and Microwave Technology |
308 | Gas Feed System in Negative Ion Source Experimental Facility at IPR | Dr. BANSAL, Gourab | Beam Sources |
311 | Monte Carlo Simulation to estimate muon dose at high energy proton accelerator | Prof. MITRA, BANDYOPADHYAY, SARKAR, M Sengupta, Tapas, P.k. | Radiation Safety |
312 | RADIATION HAZARDS AND RADIOACTIVATION STUDIES AT VAULT FOR K 500 SCC, VECC | Mr. R, Ravishankar | Radiation Safety |
314 | Remote Radiation Mapping of the Kolkata K-130 Cyclotron Using Mobile Robot | Prof. D. Sarkar | Radiation Safety |
315 | Design of Horizontal Test Stand (HTS-2) for SCRF cavities at RRCAT | Mr. Kush, Pradeep | Accelerating Structures |
316 | Development of Pneumatic Gate valve controller for Indus-2 | Mr. KANE, Sanjeev | Instrumentation and Control Systems |